§ 105-36. Grounds for issuance or denial of permit by Building Inspector.  


Latest version.
  • The Building Inspector shall not issue any building or alteration permit for which the application has been disapproved by the Planning Board as provided in § 105-35, unless the plans for such building or alteration have been changed to embody any modifications in design which the Planning Board may have suggested as adequate to render such design acceptable. If the Planning Board approves an application or if, within 45 days after the date on which an application has been duly filed with the Planning Board or within such longer period as may have been consented to by the applicant, the Planning Board has not disapproved the same, the Building Inspector shall issue the permit applied for if the same conforms to the provisions of all other applicable laws and ordinances.
Amended 4-10-1972; 9-14-1987 by L.L. No. 4-1987